- State
- UT
I have to rework the trailer on the new-to-me boat. I can run rigid bunks the length of the keel, at least as long as the distance between the two points on the TWO POINTS diagram. These are the drawings showing how to set up the trailer for the 210... but wouldn't long rigid bunks the full length of the keel be better support than the two point system on the drawing, given that my trailer will accommodate this?